{"id":1385,"date":"2026-11-16T01:00:00","date_gmt":"2026-11-16T01:00:00","guid":{"rendered":"https:\/\/sdddks.com\/?p=1385"},"modified":"2026-10-13T08:26:08","modified_gmt":"2026-10-13T08:26:08","slug":"oil-immersed-hermetically-sealed-type-transformer-tank-design-and-monitoring","status":"publish","type":"post","link":"https:\/\/sdddks.com\/ru\/oil-immersed-hermetically-sealed-type-transformer-tank-design-and-monitoring\/","title":{"rendered":"Oil Immersed Hermetically Sealed Type Transformer: Tank Design and Monitoring"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>\u041e\u0433\u043b\u0430\u0432\u043b\u0435\u043d\u0438\u0435<\/h2><nav><ul><li class=\"\"><a href=\"#oil-immersed-hermetically-sealed-type-transformer-ask-how-the-design-accommodates-volume-change\">Oil Immersed Hermetically Sealed Type Transformer: Ask how the design accommodates volume change<\/a><\/li><li class=\"\"><a href=\"#make-the-inspection-strategy-equipment-specific\">Make the inspection strategy equipment-specific<\/a><\/li><li class=\"\"><a href=\"#compare-preservation-designs-against-site-capability\">Compare preservation designs against site capability<\/a><\/li><li class=\"\"><a href=\"#specify-the-liquid-system-and-environmental-provisions\">Specify the liquid system and environmental provisions<\/a><\/li><li class=\"\"><a href=\"#check-the-heat-path-through-the-complete-installation\">Check the heat path through the complete installation<\/a><\/li><li class=\"\"><a href=\"#compare-the-operating-commitment-as-well-as-the-price\">Compare the operating commitment as well as the price<\/a><\/li><li class=\"\"><a href=\"#worked-procurement-scenario\">Worked procurement scenario<\/a><\/li><li class=\"\"><a href=\"#compare-the-decision-evidence\">Compare the decision evidence<\/a><\/li><li class=\"\"><a href=\"#prepare-a-focused-project-enquiry\">Prepare a focused project enquiry<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">A sealed tank changes the way a liquid-filled transformer manages contact with the atmosphere and changes in liquid volume. It does not remove the need to understand pressure, thermal limits and maintenance. An oil immersed hermetically sealed type transformer should be evaluated from its actual preservation design and operating instructions, rather than from the word &#x27;sealed&#x27; alone.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1.jpg\" alt=\"Oil immersed transformer with grey tank, cooling fins and top bushings\" class=\"wp-image-182\" srcset=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1.jpg 1000w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-300x300.jpg 300w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-100x100.jpg 100w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-600x600.jpg 600w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-150x150.jpg 150w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-768x768.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"oil-immersed-hermetically-sealed-type-transformer-ask-how-the-design-accommodates-volume-change\">Oil Immersed Hermetically Sealed Type Transformer: Ask how the design accommodates volume change<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Insulating liquid changes volume with temperature. Ask the manufacturer to explain how the offered tank design accommodates that change and which operating limits apply. An oil immersed hermetically sealed type transformer may use design features that differ from a conservator arrangement. The enquiry should ask for the relevant drawings, monitoring provisions and handling requirements without assuming one tank construction is universal.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"make-the-inspection-strategy-equipment-specific\">Make the inspection strategy equipment-specific<\/h2>\n\n\n<p class=\"wp-block-paragraph\">A sealed design should not be advertised as requiring no inspection. The owner still needs to monitor condition and respond to abnormal indications according to the manufacturer&#x27;s instructions. For an oil immersed hermetically sealed type transformer, establish the permitted inspection and sampling arrangements with the supplier. Unauthorised opening or intervention can change the condition of the preservation system and should not be treated as a routine general procedure.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-preservation-designs-against-site-capability\">Compare preservation designs against site capability<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Consider who will maintain the equipment, how easily competent support can reach the location and what condition records the owner will retain. An oil immersed hermetically sealed type transformer may suit a defined operating model, but the selection should also address liquid type, protection accessories and environmental provisions. Ask for a documented explanation of any claimed maintenance advantage and its limits.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"specify-the-liquid-system-and-environmental-provisions\">Specify the liquid system and environmental provisions<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The insulating liquid is part of both the dielectric and cooling design. The proposal should identify the liquid type, tank arrangement and monitoring accessories rather than using the word &#x27;oil&#x27; as a complete specification. Different liquids and preservation systems can require different acceptance criteria and maintenance practices. A substitution should be reviewed by the equipment manufacturer and the project designer.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For an outdoor installation, coordinate the foundation, drainage, spill containment and applicable fire provisions with the relevant local requirements. Do not infer those arrangements from a product photograph. Ask which valves, gauges, protection devices and sampling provisions are included, then confirm that operators will be able to access the intended points using the approved maintenance procedure.<\/p>\n\n\n<p class=\"wp-block-paragraph\">In the enquiry for an oil immersed hermetically sealed type transformer, separate normal operating limits from any exceptional loading proposal. A general statement about overload capability is not a project-specific permission. Request the manufacturer&#x27;s applicable loading guidance, thermal assumptions and life considerations. The owner also needs a plan for periodic inspection, condition assessment and abnormal indications, supported by competent personnel and equipment-specific documentation.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"check-the-heat-path-through-the-complete-installation\">Check the heat path through the complete installation<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Every watt of loss must eventually leave the equipment and its surrounding space. Ask for losses at the stated reference conditions, the cooling arrangement and the ambient assumptions used for the offered rating. The temperature at a weather station may differ from the air entering an enclosure, especially beside a hot process, under a roof or in a sun-exposed yard. Record the installation conditions separately from the standard service conditions in a catalogue.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Ventilation drawings should show the actual inlet and outlet routes, obstructions, filters and the possibility of hot air returning to the inlet. Adding a fan is not a complete thermal design. It also introduces auxiliary power, controls, maintenance access and an operating condition after fan failure. Discuss whether an alarm, a reduced permissible load or a controlled shutdown is required for the particular equipment and process.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For an oil immersed hermetically sealed type transformer, review the assembled arrangement rather than assuming a rating for an open component also applies inside a selected enclosure. Ask for the applicable verification or thermal assessment and its limits. Keep temperature monitoring useful by defining who receives an alarm, how it is recorded and what approved response follows. A sensor without an action owner adds data but may do little to protect continuity.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-the-operating-commitment-as-well-as-the-price\">Compare the operating commitment as well as the price<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The purchase price covers only part of ownership. Identify the work needed to inspect, maintain, test and eventually replace the proposed equipment. Ask which consumables, specialist tools and spare parts are required and whether competent support is available at the project location. Avoid comparing two offers as if they impose the same maintenance burden when one depends on a different operating model.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Use a transparent comparison period and state assumptions for energy price, utilisation, service visits and planned outages. Where reliable input data are unavailable, show a range rather than a precise savings claim. A higher initial price may be justified by measured losses, access or continuity, but the reason should be visible in the comparison. Do not promise a payback period without the project&#x27;s own inputs.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For an oil immersed hermetically sealed type transformer, request maintenance instructions and the recommended spares list before final acceptance. Agree warranty scope, response arrangements and the information needed to assess a fault report. Establish a baseline at handover with serial numbers, settings, inspection results and approved drawings. Future maintenance decisions are stronger when operators can compare current conditions with a documented starting point.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1.jpg\" alt=\"Oil immersed transformers arranged in a production workshop\" class=\"wp-image-183\" srcset=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1.jpg 1000w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-300x300.jpg 300w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-100x100.jpg 100w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-600x600.jpg 600w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-150x150.jpg 150w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-768x768.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"worked-procurement-scenario\">Worked procurement scenario<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Illustrative planning example.<\/strong> A remote industrial site is comparing a sealed design with another preservation arrangement. The useful comparison includes inspection requirements, access to qualified service and the information available from fitted monitoring devices. It should not assign zero maintenance cost to the sealed option simply because there is no familiar external conservator.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Turn this scenario into a project decision by assigning an owner to each unresolved item. The electrical designer confirms the network assumptions; the supplier identifies the offered configuration; and the site team checks access and connection readiness. Record the drawing revision behind the agreement. If any one of those inputs changes, return the affected item to review instead of relying on the previous approval.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-the-decision-evidence\">Compare the decision evidence<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Use the following comparison when reviewing oil immersed hermetically sealed type transformer proposals. The right-hand column describes an assumption to challenge, rather than an acceptable alternative specification.<\/p>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Decision<\/th><th>Evidence to request<\/th><th>Common mistake<\/th><\/tr><\/thead><tbody><tr><td>Volume accommodation<\/td><td>Tank design explanation<\/td><td>Treating sealed as rigid and unchanging<\/td><\/tr><tr><td>Condition access<\/td><td>Manufacturer inspection instructions<\/td><td>Applying generic sampling procedures<\/td><\/tr><tr><td>Service model<\/td><td>Support and maintenance schedule<\/td><td>Assuming zero lifetime attention<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p class=\"wp-block-paragraph\">Apply the comparison to each bidder on the same revision of the enquiry. A response marked &#8220;included&#8221; is only useful if the quotation, drawing or document register identifies what is included. Separate an open technical question from a priced exclusion. That distinction helps procurement compare the actual scope and keeps an attractive initial price from concealing work that the project must still fund.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"prepare-a-focused-project-enquiry\">Prepare a focused project enquiry<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Start with the <a href=\"https:\/\/sdddks.com\/ru\/product\/oil-immersed-transformer\/\">\u041c\u0430\u0441\u043b\u044f\u043d\u044b\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440<\/a> product page and the broader <a href=\"https:\/\/sdddks.com\/ru\/product-category\/power-transformer\/\">\u0421\u0438\u043b\u043e\u0432\u043e\u0439 \u0442\u0440\u0430\u043d\u0441\u0444\u043e\u0440\u043c\u0430\u0442\u043e\u0440<\/a> range. Treat the published page as a starting point for discussion; obtain project-specific drawings, ratings, accessories and delivery scope before committing to the order.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Send Shandong Dedication Electric your single-line diagram, site conditions, required quantity and target delivery window. For an oil immersed hermetically sealed type transformer, also highlight volume accommodation, condition access, service model. Ask for an itemised technical response with deviations identified, so the engineering and purchasing teams can review the same proposed configuration.<\/p>\n\n\n<p class=\"wp-block-paragraph\">If the package forms part of a larger installation, discuss the boundary with the company&#8217;s <a href=\"https:\/\/sdddks.com\/ru\/service\/\">electrical engineering and EPC services<\/a>. Equipment supply, civil work, installation, testing and utility coordination should each have a named owner. A product image or a catalogue description cannot establish that those activities are included in the quoted price.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Related enquiries may use terms such as oil immersed power transformer and oil immersed distribution transformer. Keep the terminology aligned with the same equipment schedule: similar search terms do not remove differences in rating, construction, environment or contractual responsibility.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For the applicable technical framework, consult the official <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/588\" target=\"_blank\" rel=\"noopener\">IEC 60076-1 publication listing<\/a>. Confirm the edition, amendments and local adoption required by the project with the responsible engineer. Referencing a standard here is not a claim that any pictured product has a particular certification, classification or test result.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">\u0427\u0430\u0441\u0442\u043e \u0437\u0430\u0434\u0430\u0432\u0430\u0435\u043c\u044b\u0435 \u0432\u043e\u043f\u0440\u043e\u0441\u044b<\/h2>\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-ddks-21-0\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information matters most when evaluating an oil immersed hermetically sealed type transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Begin with volume accommodation. Request this evidence: Tank design explanation. Identify who approves it and challenge the assumption described as &#8216;Treating sealed as rigid and unchanging&#8217;. Keep the agreed requirement traceable to the quotation and the equipment schedule.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-21-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which evidence helps compare options for an oil immersed hermetically sealed type transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review this evidence alongside the offered scope: Manufacturer inspection instructions. For condition access, check the assumptions, limitations and revision status rather than relying on a brief catalogue statement. Ask each bidder to answer against the same project conditions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-21-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What issue is easy to miss when evaluating an oil immersed hermetically sealed type transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Pay attention to service model. Request this evidence: Support and maintenance schedule. Challenge this potential mistake: Assuming zero lifetime attention. An unresolved obligation can otherwise pass to the site team after the order has already been placed.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-21-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is a catalogue enough to evaluate an oil immersed hermetically sealed type transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The offered equipment still needs confirmation of its electrical duty, installation environment and connection interfaces. Obtain the configuration offered for the actual project, identify any deviations and ask the responsible engineering team to approve them before manufacture or release.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-21-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should a quotation request include?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>For an enquiry concerning an oil immersed hermetically sealed type transformer, send the project drawings, quantity, location, service conditions and delivery target, together with the priorities in this tank design and monitoring discussion. Request a technical schedule and a clearly itemised scope. Commercial acceptance should follow resolution of the material technical questions.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class='fluentform ff-default fluentform_wrapper_1 ffs_default_wrap'><form data-form_id=\"1\" id=\"fluentform_1\" class=\"frm-fluent-form fluent_form_1 ff-el-form-top ff_form_instance_1_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_1_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8<\/legend><input type='hidden' name='__fluent_form_embded_post_id' value='1385' \/><input type=\"hidden\" id=\"_fluentform_1_fluentformnonce\" name=\"_fluentform_1_fluentformnonce\" value=\"94912783b5\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/ru\/wp-json\/wp\/v2\/posts\/1385\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_input_text' id='label_ff_1_input_text' aria-label=\"\u0418\u043c\u044f\">\u0418\u043c\u044f<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"\u0418\u043c\u044f\" data-name=\"input_text\" id=\"ff_1_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_email' id='label_ff_1_email' aria-label=\"\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u043d\u043d\u0430\u044f \u043f\u043e\u0447\u0442\u0430\">\u042d\u043b\u0435\u043a\u0442\u0440\u043e\u043d\u043d\u0430\u044f \u043f\u043e\u0447\u0442\u0430<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_1_email\" class=\"ff-el-form-control\" placeholder=\"\u0410\u0434\u0440\u0435\u0441 \u044d\u043b\u0435\u043a\u0442\u0440\u043e\u043d\u043d\u043e\u0439 \u043f\u043e\u0447\u0442\u044b\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_phone' id='label_ff_1_phone' aria-label=\"\u0422\u0435\u043b\u0435\u0444\u043e\u043d\/\u043c\u043e\u0431\u0438\u043b\u044c\u043d\u044b\u0439\">\u0422\u0435\u043b\u0435\u0444\u043e\u043d\/\u043c\u043e\u0431\u0438\u043b\u044c\u043d\u044b\u0439<\/label><\/div><div class='ff-el-input--content'><input name=\"phone\" class=\"ff-el-form-control ff-el-phone\" type=\"tel\" placeholder=\"\u041d\u043e\u043c\u0435\u0440 \u043c\u043e\u0431\u0438\u043b\u044c\u043d\u043e\u0433\u043e \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430\" data-name=\"phone\" id=\"ff_1_phone\" inputmode=\"tel\"  aria-invalid='false' aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_1_message' id='label_ff_1_message' aria-label=\"\u0412\u0430\u0448\u0435 \u0441\u043e\u043e\u0431\u0449\u0435\u043d\u0438\u0435\">\u0412\u0430\u0448\u0435 \u0441\u043e\u043e\u0431\u0449\u0435\u043d\u0438\u0435<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_1_message\" name=\"message\" id=\"ff_1_message\" class=\"ff-el-form-control\" placeholder=\"\u0412\u0430\u0448\u0435 \u0441\u043e\u043e\u0431\u0449\u0435\u043d\u0438\u0435\" rows=\"4\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"\u041e\u0442\u043f\u0440\u0430\u0432\u0438\u0442\u044c \u0444\u043e\u0440\u043c\u0443\">\u041e\u0442\u043f\u0440\u0430\u0432\u0438\u0442\u044c \u0444\u043e\u0440\u043c\u0443<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"ru\"\/><\/form><div id='fluentform_1_errors' class='ff-errors-in-stack ff_form_instance_1_1 ff-form-loading_errors ff_form_instance_1_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_1_1 = {\"id\":\"1\",\"ajaxUrl\":\"https:\\\/\\\/sdddks.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_1_1\",\"form_id_selector\":\"fluentform_1\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"\\u042d\\u0442\\u043e \\u043f\\u043e\\u043b\\u0435 \\u043e\\u0431\\u044f\\u0437\\u0430\\u0442\\u0435\\u043b\\u044c\\u043d\\u043e\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"phone\":{\"required\":{\"value\":true,\"global\":true,\"message\":\"\\u042d\\u0442\\u043e \\u043f\\u043e\\u043b\\u0435 \\u043e\\u0431\\u044f\\u0437\\u0430\\u0442\\u0435\\u043b\\u044c\\u043d\\u043e\",\"global_message\":\"This field is required\"},\"valid_phone_number\":{\"value\":false,\"global\":true,\"message\":\"\\u041d\\u043e\\u043c\\u0435\\u0440 \\u0442\\u0435\\u043b\\u0435\\u0444\\u043e\\u043d\\u0430 \\u043d\\u0435\\u0434\\u0435\\u0439\\u0441\\u0442\\u0432\\u0438\\u0442\\u0435\\u043b\\u0435\\u043d\",\"global_message\":\"Phone number is not valid\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Evaluate oil immersed hermetically sealed type transformer. Compare technical scope, supplier evidence and site interfaces before requesting a project quote.<\/p>","protected":false},"author":1,"featured_media":182,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Oil Immersed Hermetically Sealed Type Transformer: Tank","rank_math_description":"Evaluate oil immersed hermetically sealed type transformer. Compare technical scope, supplier evidence and site interfaces before requesting a project quote.","rank_math_canonical_url":"https:\/\/sdddks.com\/oil-immersed-hermetically-sealed-type-transformer-tank-design-and-monitoring\/","rank_math_focus_keyword":"oil immersed hermetically sealed type transformer"},"categories":[1],"tags":[],"class_list":["post-1385","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/posts\/1385","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/comments?post=1385"}],"version-history":[{"count":1,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/posts\/1385\/revisions"}],"predecessor-version":[{"id":1386,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/posts\/1385\/revisions\/1386"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/media\/182"}],"wp:attachment":[{"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/media?parent=1385"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/categories?post=1385"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdddks.com\/ru\/wp-json\/wp\/v2\/tags?post=1385"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}