{"id":1365,"date":"2026-10-28T01:00:00","date_gmt":"2026-10-28T01:00:00","guid":{"rendered":"https:\/\/sdddks.com\/?p=1365"},"modified":"2026-10-13T08:24:16","modified_gmt":"2026-10-13T08:24:16","slug":"oil-immersed-distribution-transformer-factory-load-planning","status":"publish","type":"post","link":"https:\/\/sdddks.com\/ar\/oil-immersed-distribution-transformer-factory-load-planning\/","title":{"rendered":"Oil Immersed Distribution Transformer: Factory Load Planning"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u062d\u062a\u0648\u064a\u0627\u062a<\/h2><nav><ul><li class=\"\"><a href=\"#oil-immersed-distribution-transformer-separate-steady-demand-from-short-events\">Oil Immersed Distribution Transformer: Separate steady demand from short events<\/a><\/li><li class=\"\"><a href=\"#evaluate-impedance-as-a-system-parameter\">Evaluate impedance as a system parameter<\/a><\/li><li class=\"\"><a href=\"#distinguish-installed-reserve-from-useful-resilience\">Distinguish installed reserve from useful resilience<\/a><\/li><li class=\"\"><a href=\"#build-the-load-picture-before-fixing-the-rating\">Build the load picture before fixing the rating<\/a><\/li><li class=\"\"><a href=\"#match-equipment-duties-to-the-network-study\">Match equipment duties to the network study<\/a><\/li><li class=\"\"><a href=\"#specify-the-liquid-system-and-environmental-provisions\">Specify the liquid system and environmental provisions<\/a><\/li><li class=\"\"><a href=\"#worked-procurement-scenario\">Worked procurement scenario<\/a><\/li><li class=\"\"><a href=\"#compare-the-decision-evidence\">Compare the decision evidence<\/a><\/li><li class=\"\"><a href=\"#prepare-a-focused-project-enquiry\">Prepare a focused project enquiry<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0645\u062a\u062f\u0627\u0648\u0644\u0629<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">Distribution duty is defined by the loads supplied over a working day. An oil immersed distribution transformer serving a factory may see a very different profile from a similar-sized unit serving a warehouse or construction site. The procurement brief should describe load diversity, starting events, likely growth and operating contingencies so that capacity, losses and protection can be evaluated together.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1.jpg\" alt=\"Oil immersed transformer with grey tank, cooling fins and top bushings\" class=\"wp-image-182\" srcset=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1.jpg 1000w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-300x300.jpg 300w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-100x100.jpg 100w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-600x600.jpg 600w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-150x150.jpg 150w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer-1-768x768.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"oil-immersed-distribution-transformer-separate-steady-demand-from-short-events\">Oil Immersed Distribution Transformer: Separate steady demand from short events<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Record the expected simultaneous operating load and identify large loads that start or change rapidly. A short event can matter to voltage performance even if its contribution to annual energy is small. For an oil immersed distribution transformer, give the designer the motor starting method, expected sequencing and available source information. Avoid solving every uncertain event by increasing capacity without checking the voltage and protection implications.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"evaluate-impedance-as-a-system-parameter\">Evaluate impedance as a system parameter<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Impedance influences voltage behaviour and fault levels, so it belongs in the technical assessment rather than a price-only comparison. Ask the responsible engineer to check the proposed value against the network design and acceptable tolerances. An oil immersed distribution transformer selected for one source and feeder arrangement should be reassessed if the source, tie operation or downstream network changes during the project.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"distinguish-installed-reserve-from-useful-resilience\">Distinguish installed reserve from useful resilience<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Extra kVA provides a different benefit from a spare unit or an alternative supply path. Decide which interruption scenarios the business must tolerate and what recovery time is acceptable. The oil immersed distribution transformer enquiry should identify any required emergency operating condition explicitly. The supplier can then respond to a defined duty instead of an ambiguous request for &#x27;high overload capability&#x27;.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"build-the-load-picture-before-fixing-the-rating\">Build the load picture before fixing the rating<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Start with a load schedule that separates connected capacity from demand that is expected to occur at the same time. A list of motor nameplates does not describe a working factory shift. Record normal production, startup, standby operation and the expansion that has actually been approved. Keep the present project and a possible future phase in separate columns so that an uncertain extension does not silently become a firm equipment requirement.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For a balanced three-phase load, apparent power in kVA is approximately kW divided by power factor. For example, an illustrative 800 kW load at 0.90 power factor represents about 889 kVA before project allowances. This arithmetic is a starting point, not a final selection. Harmonic heating, starting duty, ambient temperature, redundancy and the manufacturer&#x27;s rating conditions still require review. Keep the assumptions beside the calculation so another engineer can check them.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Use this load picture when discussing an oil immersed distribution transformer. Ask the supplier to identify the duty on which its proposal is based, rather than accepting an unexplained percentage of spare capacity. A defensible allowance has a reason: a scheduled production line, an identified large starting load, or a documented operating contingency. That explanation is more useful than a larger number without a matching operating scenario.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"match-equipment-duties-to-the-network-study\">Match equipment duties to the network study<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Continuous current and short-circuit duty describe different operating conditions. The first concerns carrying the normal load. The second concerns the magnitude and duration of abnormal current and the equipment&#x27;s ability to withstand or interrupt it. A proposal that states only the continuous rating leaves a major selection question unanswered. Use a network study based on the intended source arrangement, including credible alternative operating configurations.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Ask the designer to identify the maximum prospective fault current, the relevant peak duty and the clearing time used for the specification. Changes such as a larger transformer, a normally open tie becoming closed, or an additional generating source can change the result. Do not reuse an old study simply because the new equipment occupies the same room. Record the assumptions that would trigger a fresh calculation.<\/p>\n\n\n<p class=\"wp-block-paragraph\">In the package for an oil immersed distribution transformer, distinguish the interrupting device&#x27;s rating from the assembly&#x27;s verified withstand capability. Protection settings, instrument transformer selection and the downstream equipment also need coordination. Obtain a consistent study and settings package from the responsible engineer. This guide concerns procurement checks; it does not provide field switching instructions or substitute for an approved electrical design.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"specify-the-liquid-system-and-environmental-provisions\">Specify the liquid system and environmental provisions<\/h2>\n\n\n<p class=\"wp-block-paragraph\">The insulating liquid is part of both the dielectric and cooling design. The proposal should identify the liquid type, tank arrangement and monitoring accessories rather than using the word &#x27;oil&#x27; as a complete specification. Different liquids and preservation systems can require different acceptance criteria and maintenance practices. A substitution should be reviewed by the equipment manufacturer and the project designer.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For an outdoor installation, coordinate the foundation, drainage, spill containment and applicable fire provisions with the relevant local requirements. Do not infer those arrangements from a product photograph. Ask which valves, gauges, protection devices and sampling provisions are included, then confirm that operators will be able to access the intended points using the approved maintenance procedure.<\/p>\n\n\n<p class=\"wp-block-paragraph\">In the enquiry for an oil immersed distribution transformer, separate normal operating limits from any exceptional loading proposal. A general statement about overload capability is not a project-specific permission. Request the manufacturer&#x27;s applicable loading guidance, thermal assumptions and life considerations. The owner also needs a plan for periodic inspection, condition assessment and abnormal indications, supported by competent personnel and equipment-specific documentation.<\/p>\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1.jpg\" alt=\"Oil immersed transformers arranged in a production workshop\" class=\"wp-image-183\" srcset=\"https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1.jpg 1000w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-300x300.jpg 300w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-100x100.jpg 100w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-600x600.jpg 600w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-150x150.jpg 150w, https:\/\/sdddks.com\/wp-content\/uploads\/2025\/11\/Oil-immersed-transformer2-1-768x768.jpg 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n<h2 class=\"wp-block-heading\" id=\"worked-procurement-scenario\">Worked procurement scenario<\/h2>\n\n\n<p class=\"wp-block-paragraph\"><strong>Illustrative planning example.<\/strong> A plant has modest average demand but a production process that starts several large motors together. The project team can compare revised starting sequences, network changes and transformer proposals using the same operating scenario. This gives a more useful decision than assuming annual energy consumption alone determines the required transformer size.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Turn this scenario into a project decision by assigning an owner to each unresolved item. The electrical designer confirms the network assumptions; the supplier identifies the offered configuration; and the site team checks access and connection readiness. Record the drawing revision behind the agreement. If any one of those inputs changes, return the affected item to review instead of relying on the previous approval.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"compare-the-decision-evidence\">Compare the decision evidence<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Use the following comparison when reviewing oil immersed distribution transformer proposals. The right-hand column describes an assumption to challenge, rather than an acceptable alternative specification.<\/p>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Decision<\/th><th>Evidence to request<\/th><th>Common mistake<\/th><\/tr><\/thead><tbody><tr><td>Demand profile<\/td><td>Simultaneous load and start schedule<\/td><td>Sizing from connected nameplates alone<\/td><\/tr><tr><td>Impedance<\/td><td>Network study and guaranteed data<\/td><td>Ignoring fault-level changes<\/td><\/tr><tr><td>Continuity<\/td><td>Defined outage and contingency case<\/td><td>Confusing spare capacity with redundancy<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p class=\"wp-block-paragraph\">Apply the comparison to each bidder on the same revision of the enquiry. A response marked &#8220;included&#8221; is only useful if the quotation, drawing or document register identifies what is included. Separate an open technical question from a priced exclusion. That distinction helps procurement compare the actual scope and keeps an attractive initial price from concealing work that the project must still fund.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"prepare-a-focused-project-enquiry\">Prepare a focused project enquiry<\/h2>\n\n\n<p class=\"wp-block-paragraph\">Start with the <a href=\"https:\/\/sdddks.com\/ar\/product\/oil-immersed-transformer\/\">\u0645\u062d\u0648\u0644 \u0645\u063a\u0645\u0648\u0631 \u0628\u0627\u0644\u0632\u064a\u062a<\/a> product page and the broader <a href=\"https:\/\/sdddks.com\/ar\/product-category\/power-transformer\/\">\u0645\u062d\u0648\u0644 \u0627\u0644\u0637\u0627\u0642\u0629<\/a> range. Treat the published page as a starting point for discussion; obtain project-specific drawings, ratings, accessories and delivery scope before committing to the order.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Send Shandong Dedication Electric your single-line diagram, site conditions, required quantity and target delivery window. For an oil immersed distribution transformer, also highlight demand profile, impedance, continuity. Ask for an itemised technical response with deviations identified, so the engineering and purchasing teams can review the same proposed configuration.<\/p>\n\n\n<p class=\"wp-block-paragraph\">If the package forms part of a larger installation, discuss the boundary with the company&#8217;s <a href=\"https:\/\/sdddks.com\/ar\/service\/\">electrical engineering and EPC services<\/a>. Equipment supply, civil work, installation, testing and utility coordination should each have a named owner. A product image or a catalogue description cannot establish that those activities are included in the quoted price.<\/p>\n\n\n<p class=\"wp-block-paragraph\">Related enquiries may use terms such as oil immersed power transformer and oil immersed transformer. Keep the terminology aligned with the same equipment schedule: similar search terms do not remove differences in rating, construction, environment or contractual responsibility.<\/p>\n\n\n<p class=\"wp-block-paragraph\">For the applicable technical framework, consult the official <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/588\" target=\"_blank\" rel=\"noopener\">IEC 60076-1 publication listing<\/a>. Confirm the edition, amendments and local adoption required by the project with the responsible engineer. Referencing a standard here is not a claim that any pictured product has a particular certification, classification or test result.<\/p>\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0645\u062a\u062f\u0627\u0648\u0644\u0629<\/h2>\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-ddks-11-0\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information matters most when evaluating an oil immersed distribution transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Begin with demand profile. Request this evidence: Simultaneous load and start schedule. Identify who approves it and challenge the assumption described as &#8216;Sizing from connected nameplates alone&#8217;. Keep the agreed requirement traceable to the quotation and the equipment schedule.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-11-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which evidence helps compare options for an oil immersed distribution transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review this evidence alongside the offered scope: Network study and guaranteed data. For impedance, check the assumptions, limitations and revision status rather than relying on a brief catalogue statement. Ask each bidder to answer against the same project conditions.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-11-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What issue is easy to miss when evaluating an oil immersed distribution transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Pay attention to continuity. Request this evidence: Defined outage and contingency case. Challenge this potential mistake: Confusing spare capacity with redundancy. An unresolved obligation can otherwise pass to the site team after the order has already been placed.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-11-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Is a catalogue enough to evaluate an oil immersed distribution transformer?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. The offered equipment still needs confirmation of its electrical duty, installation environment and connection interfaces. Obtain the configuration offered for the actual project, identify any deviations and ask the responsible engineering team to approve them before manufacture or release.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-ddks-11-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What should a quotation request include?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>For an enquiry concerning an oil immersed distribution transformer, send the project drawings, quantity, location, service conditions and delivery target, together with the priorities in this factory load planning discussion. Request a technical schedule and a clearly itemised scope. Commercial acceptance should follow resolution of the material technical questions.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class='fluentform ff-default fluentform_wrapper_1 ffs_default_wrap'><form data-form_id=\"1\" id=\"fluentform_1\" class=\"frm-fluent-form fluent_form_1 ff-el-form-top ff_form_instance_1_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_1_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u5b98\u7f51\u8be2\u76d8\u7f51\u8be2\u76d8<\/legend><input type='hidden' name='__fluent_form_embded_post_id' value='1365' \/><input type=\"hidden\" id=\"_fluentform_1_fluentformnonce\" name=\"_fluentform_1_fluentformnonce\" value=\"7f81663020\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/ar\/wp-json\/wp\/v2\/posts\/1365\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_input_text' id='label_ff_1_input_text' aria-label=\"\u0627\u0644\u0627\u0633\u0645\">\u0627\u0644\u0627\u0633\u0645<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"\u0627\u0644\u0627\u0633\u0645\" data-name=\"input_text\" id=\"ff_1_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_email' id='label_ff_1_email' aria-label=\"\u0627\u0644\u0628\u0631\u064a\u062f \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\">\u0627\u0644\u0628\u0631\u064a\u062f \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_1_email\" class=\"ff-el-form-control\" placeholder=\"\u0639\u0646\u0648\u0627\u0646 \u0627\u0644\u0628\u0631\u064a\u062f \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_1_phone' id='label_ff_1_phone' aria-label=\"\u0627\u0644\u0647\u0627\u062a\u0641\/\u0627\u0644\u0645\u062d\u0645\u0648\u0644\">\u0627\u0644\u0647\u0627\u062a\u0641\/\u0627\u0644\u0645\u062d\u0645\u0648\u0644<\/label><\/div><div class='ff-el-input--content'><input name=\"phone\" class=\"ff-el-form-control ff-el-phone\" type=\"tel\" placeholder=\"\u0631\u0642\u0645 \u0627\u0644\u0647\u0627\u062a\u0641 \u0627\u0644\u0645\u062d\u0645\u0648\u0644\" data-name=\"phone\" id=\"ff_1_phone\" inputmode=\"tel\"  aria-invalid='false' aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_1_message' id='label_ff_1_message' aria-label=\"\u0631\u0633\u0627\u0644\u062a\u0643\">\u0631\u0633\u0627\u0644\u062a\u0643<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_1_message\" name=\"message\" id=\"ff_1_message\" class=\"ff-el-form-control\" placeholder=\"\u0631\u0633\u0627\u0644\u062a\u0643\" rows=\"4\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"\u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c\">\u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"ar\"\/><\/form><div id='fluentform_1_errors' class='ff-errors-in-stack ff_form_instance_1_1 ff-form-loading_errors ff_form_instance_1_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_1_1 = {\"id\":\"1\",\"ajaxUrl\":\"https:\\\/\\\/sdddks.com\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_1_1\",\"form_id_selector\":\"fluentform_1\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"\\u0647\\u0630\\u0627 \\u0627\\u0644\\u062d\\u0642\\u0644 \\u0645\\u0637\\u0644\\u0648\\u0628\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"phone\":{\"required\":{\"value\":true,\"global\":true,\"message\":\"\\u0647\\u0630\\u0627 \\u0627\\u0644\\u062d\\u0642\\u0644 \\u0645\\u0637\\u0644\\u0648\\u0628\",\"global_message\":\"This field is required\"},\"valid_phone_number\":{\"value\":false,\"global\":true,\"message\":\"\\u0631\\u0642\\u0645 \\u0627\\u0644\\u0647\\u0627\\u062a\\u0641 \\u063a\\u064a\\u0631 \\u0635\\u0627\\u0644\\u062d\",\"global_message\":\"Phone number is not valid\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Evaluate oil immersed distribution transformer. Compare technical scope, supplier evidence and site interfaces before requesting a project quote.<\/p>","protected":false},"author":1,"featured_media":182,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Oil Immersed Distribution Transformer: Load Planning","rank_math_description":"Evaluate oil immersed distribution transformer. Compare technical scope, supplier evidence and site interfaces before requesting a project quote.","rank_math_canonical_url":"https:\/\/sdddks.com\/oil-immersed-distribution-transformer-factory-load-planning\/","rank_math_focus_keyword":"oil immersed distribution transformer"},"categories":[1],"tags":[],"class_list":["post-1365","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/posts\/1365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/comments?post=1365"}],"version-history":[{"count":1,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/posts\/1365\/revisions"}],"predecessor-version":[{"id":1366,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/posts\/1365\/revisions\/1366"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/media\/182"}],"wp:attachment":[{"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/media?parent=1365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/categories?post=1365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sdddks.com\/ar\/wp-json\/wp\/v2\/tags?post=1365"}],"curies":[{"name":"\u062f\u0628\u0644\u064a\u0648 \u0628\u064a","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}